Gold Member Since 2012
Audited Supplier
Taizhou Huangyan Yongsheng Mould Co., Ltd.

Plastic Stool Mould, Household Plastic Mould, Plastic Stool Mould( manufacturer / supplier in China, offering Plastic table with Plastic Stool Mould (YS11), Cold Rnner Plastic Injection Edible Oil Cap Mold, 250ml 500ml 1000ml Bottle Blowing Mold and so on.

(/ )

Supplier Homepage Product plastic table and Stool/Chair mould Plastic table with Plastic Stool Mould (YS11)

Plastic table with Plastic Stool Mould (YS11)

Purchase Qty.:
(Sets)
1-4 5+
FOB Unit Price: US $9,000 US $8,000
Purchase Qty. (Sets) FOB Unit Price
1-4 US $9,000
5+ US $8,000
Get Latest Price
Production Capacity: 25 Plastic Stool Mould Per Month
Transport Package: Wooden Case
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: YS11
  • Surface Finish Process: Polishing
  • Plastic Material: PP/PC/ABS
  • Application: Car, Household Appliances, Commodity, Electronic, Home Use
  • Design Software: UG
  • Standard: HASCO
  • Size: All Kinds
  • Tooling Machine: CNC
  • Mould Base: Lkm, Hasco, Dme
  • Lead Time: 45-50days
  • Specification: To meet customer needs
  • HS Code: 8480719090
  • Shaping Mode: Injection Mould
  • Mould Cavity: Single Cavity
  • Process Combination Type: Single-Process Mode
  • Runner: Hot
  • Installation: Fixed
  • Name: Plastic Stool Mould
  • Cavity: Single
  • Cavity/Core Steel: P20, 718
  • Mould Time: 35-45s
  • Trademark: YS
  • Origin: China Zhejiang Taizhou
Product Description
Plastic Stool mould
1. Mould life: 500, 000 to 1, 000, 000shots
2. Mould cavity/core: P20, 718
3. Lead time: 45-50days




Name
Stool mould
Mould material
45#, P20, H13, 718, 2738, NAK80, S136etc.
Mould base
LKM, HASCOect.
Cavity
Single/multi
Runner
Hot/cold
Mould life
45#: 300, 000-500, 000shots
P20: 500, 000shots
718: 700, 000shots
Design software
UG, PROE, CADetc.
Plastic material
PP, PE, ABS, PCetc.
Delivery time
35-60days
Specification
According to client's requirements

Stool mould
1. Samples/Drawing &Requirement from you
2. Mould design: We will Communicate&Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould: Following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample's inspection report&injection parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.
Step


1. R& DWe  support  customer  R& D.   Make  the  files  or  improve  the  design  if  you  needed.
            ↓
2. Negotiationthe  quality,   price,   material,   delivery  time,   payment  item,   ect.
            ↓
3. Place  an  orderaccording  your  own  design  or  you  chooses  our  design.
4.   MouldAccording  customers  request  to  build  the  mould.   Before  make  the  mould,   we  send  mould  design  to  customer  approval  first,   before  move  forward  to  production;   we  send  samples  to  customer  to  confirm  first.
            ↓
5.   Sample  shootIf  the  first  sample  come  out  is  not  satisfied  customer,   we  modify  the  mould  and  until  meet  customers  satisfactory.
            ↓
6. Products  in  storeIf  your  quantity  is  beyond  our  storage,   we  will  provide  lead  time  to  you.
            ↓
7.   Delivery  timeDelivery  goods  by  sea  or  by  air,   according  customers  requirement
Send your message to this supplier
Avatar
Mrs. Emily
Manager
*From:
To: Mrs. Emily
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category