• Double Plate 8 Cavity Needle Valve Gate Preform Mould
  • Double Plate 8 Cavity Needle Valve Gate Preform Mould
  • Double Plate 8 Cavity Needle Valve Gate Preform Mould
  • Double Plate 8 Cavity Needle Valve Gate Preform Mould
  • Double Plate 8 Cavity Needle Valve Gate Preform Mould
  • Double Plate 8 Cavity Needle Valve Gate Preform Mould

Double Plate 8 Cavity Needle Valve Gate Preform Mould

Material: Steel
Shaping Mode: Injection Mould
Gate Type: Valve Gate
Runner System: Hot Runner
Cavity Quantity: Multi Cavity
Customized: Customized
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
YS191218
Size
48mm
Plastic Material
Pet
Mould Steel
S136/P20
Life Time
3m
Delivery Time
45 Days
Transport Package
Wooden Case
Specification
Different size
Trademark
Yongsheng
Origin
China
HS Code
8480719090
Production Capacity
500sets/Year

Product Description

MOULD DESCRIPTION:
Cavity: 8
Mould base material: P20
Core&Cavity material : S136
Runner: Hot (LOCAL BRAND,HASCO,YUDO,HUSKY ETC)
Life time: 1M
Quick T1 time: 45 days
Package: Wooden case

Double Plate 8 Cavity Needle Valve Gate Preform Mould
Double Plate 8 Cavity Needle Valve Gate Preform Mould



MOULD MANUFACTURE  PROCESS:
Grinding→ Fly-cutter → CNC Milling→ Drilling→ Lathe→ Boring lathe→ Electric pulse → Fine fly-cutter→ Polish→ Electroplate→ Assemble


Business Procedure
1. Quoting Price based on customer's request.
2. Signing the sales contract/ Stamping Proforma Invoice.
3. Starting the 2D/3D drawing of the mould. 
4. Sending customer mold 3D/2D design drawing for confirmation.
5. Starting Manufacturing after design approved by customer.
6. Testing mold with noticing customer.
7. Delivering the samples for customer's approval.
8. Doing final polish or treatment for the mold after samples approved.
9. Shipment.


Why Choose Us?(Advantages)
 
1.We specialized in manufacturing plastic injection mould for over 40 years and 
   received a high evaluation and recognition of our customers .
2. We have a high-level designers team and we adopt advanced machine as 
   CNC\DMG\EDM\CMM. 
3. During mold manufacturing, we keep customer updated with our ONLINE 
   TRACKING SYSTEM, which shows mold process clearly to customer from 
   Steel purchasing till Mold testing.
4. We have strict quality control system.
5. We do not delay any project.

 
CONTACT
 
 
Web: cnyongsheng.en.made-in-china.com


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now