Zhejiang, China
Business Type:
Manufacturer/Factory
Number of Employees:
19
Registered Capital:
73901.09 USD
Main Markets:
Southeast Asia/ Mideast, Africa, Domestic
OEM/ODM Service
Sample Available

Flip Top Cap Mould, Injection Mould, Plastic Mould manufacturer / supplier in China, offering Cold Runner Automatic Demolding Flip Cap Mold, Mineral Water Cap Mould, Plastic PP Cone Mould and so on.

Diamond Member Since 2012
Audited Supplier
Supplier Homepage Products cap mould Cold Runner Automatic Demolding Flip Cap Mold

Cold Runner Automatic Demolding Flip Cap Mold

Min. Order / Reference FOB Price
1 cavity US $1,000/ cavity
Port: Ningbo, China
Production Capacity: 25 Plastic Flip Top Cap Mould Per Month
Payment Terms: T/T
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Multi Cavity
Plastic Material: PET
Process Combination Type: Progressive Die
Application: Household Appliances

You Might Also Like

Loading...

Basic Info.

Model NO.
YS2017041510
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Standard
HASCO
Customized
Customized
Name
Plastic Flip Top Cap Mould
Mould Material
45#, P20, 718, 2738, Nak80, S136 etc.
Mould Base
Lkm, Hasco, Dme
No,Cavity
Single or Multi
Mould Life
300, 000 Times
Equipment
CNC, Nc EDM, Wire-Cutting, Large-Scale...
Trademark
YS
Transport Package
Wooden Case
Specification
to meet customer needs
Origin
China Zhejiang Huangyan
HS Code
8480719090
1.ADVANTAGE:
1.Saving 10%-30% cost than others.
2. Direct factory price
3. Life:3, 000, 000 time
4.2D and 3D provided
5. Quick T1  time: 25-40 days

6.More than 15 years experience 
 
2.PICTURE:
Cold Runner Automatic Demolding Flip Cap Mold
Cold Runner Automatic Demolding Flip Cap Mold
Cold Runner Automatic Demolding Flip Cap Mold
Cold Runner Automatic Demolding Flip Cap Mold


3.MOULD  DESCRIPTION:
1.Cavity:1-72
2.Mould base material :P20 , 45# , 4CR13 , .ECT
3.Core&Cavity material : S136,718, P20,2378,2316,4CR13,P20 .ECT
4.Runner: Cold /Hot (LOCAL BRAND,HASCO,YUDO,HUSKY .ETC)
5.Life time:3,000,000 shots
6.Quick T1 time:25-40 days
7.Package:wooden case 
 
4.MOULD  MANUFACTURE  PROCESS:
Cap Mould :
 grindingfly-cutter →CNC Milling→drillinglatheboring latheelectric pulse →fine fly-cutter→polish→electroplateinstall
 

5.AFTER  SALE  SERVICE:
Any mould problem,we will 
provide free maintenance service
 

 
6. FLOW CHART

1Sample or 2D,3D drawing from customer
2Bulid 2D,3D drawing
3CAD mould design
4Send drawing to customer to confirm
5Parts inspection/CNC machining/EDN machining
6Mould assembly
7Mould test 
8Send sample to confiom 
9Dilver the mould
 
7.CONTACT   ME:
 


 
Cold Runner Automatic Demolding Flip Cap Mold
Cold Runner Automatic Demolding Flip Cap Mold

Send your message to this supplier

*From:
*To:
avatar Mrs. Vicky
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now